St. Pancras Clinical
- St. Pancras Clinical
The Barbican, London - Budget: £60k
- Time frame: 5 months
- Complete electrical installation of medical facility including strip-out, distribution, containment, power, lighting, structured network cabling system, fire alarm system and intruder alarm.
- Contractor: St. Pancras Clinical
St. Pancras Clinical
WatkinsCole were involved in the refurbishment of St. Pancras Clinical Research offices in The Barbican, Central London. The client had a budget of £60k and a timescale of 5 months.
Our engineering team installed a complete electrical installation of the medical facility including the strip-out, distribution, containment, power, lighting, structured network cabling system, fire alarm system and an intruder alarm system.