202203.01
0
0

St. Pancras Clinical

  • St. Pancras Clinical
    The Barbican, London
  • Budget: £60k
  • Time frame: 5 months
  • Complete electrical installation of medical facility including strip-out, distribution, containment, power, lighting, structured network cabling system, fire alarm system and intruder alarm.
  • Contractor: St. Pancras Clinical

St. Pancras Clinical

WatkinsCole were involved in the refurbishment of St. Pancras Clinical Research offices in The Barbican, Central London. The client had a budget of £60k and a timescale of 5 months.

Our engineering team installed a complete electrical installation of the medical facility including the strip-out, distribution, containment, power, lighting, structured network cabling system, fire alarm system and an intruder alarm system.