South Quay Building

  • South Quay Building
    Kensington London
  • Budget: £100k
  • Time frame: 12 weeks
  • Full electrical package including Data, CCTV, Fire & Intruder Alarm with Red-Care. 

South Quay Building

WatkinsCole were involved in the refurbishment of the South Quay Building in Kensington, West London. The client had a budget of £100k and a timescale of 3 months. Our engineering team installed a complete electrical installation of the medical facility including the strip-out, distribution, containment, power, lighting, structured network cabling system, fire and intruder alarm system with Red-Care.